page-b

management machine

This adopts flame-retardant non-metallic shell, which is light in size and easy to install; it collects the real-time energy indication of each energy meter, daily zero-point frozen energy indication, and meter reading daily zero-point frozen energy indication; remote and local setting and query meter reading Program.


Product Detail

Product Tags

——General Information——

 

Product Features:

1. Adopt flame-retardant shell, light in size and easy to install

2. Collect real-time energy indication value of each energy meter, daily zero-point frozen energy indication value, meter reading day zero-point frozen energy indication value

3. The meter reading scheme can be set and inquired remotely or locally

 

——Product Function——

 

1. Data collection

The concentrator collects the real-time energy indication value of each energy meter, daily zero-point frozen energy indication value, and meter reading day-zero frozen energy indication value. Energy data should be saved with a time icon.

2. Data storage

The concentrator can classify and store the collected data as required, such as daily frozen data, meter reading daily frozen data, curve data, historical monthly data, etc.

3. Event record

The concentrator is divided into important events and general events according to the set event attributes.  Events include terminal parameter changes, meter reading failure, terminal power off / on, energy meter clock out of tolerance, etc., and can save the latest 500 event records.

4. RF card function

Can correspond to any user to support remote encryption recharge or refund.

 

——Technical Parameters——

 

voltage voltage 3×220V/380V-30%+30%
frequency 50Hz-6%+2%
accuracy voltage 0.5%
current 0.5%
working temperature -25℃+70℃
humidity 10%100%
Power consumption Non-communication <9W12VA
clock accuracy ≤±1s/d
battery 1.2Ah Lithium ion environmentally friendly battery
insulating property Power frequency withstand voltage 2.5kV
impulse withstand voltage 6kV
electrostatic discharge 8kV
data transmission communication GPRS/CDMA,Low Voltage Carrier and wired Communication Mode
hardware interface RS485 interface line2;infrared interface line 1

 

——Product pictures——

 

management machine IMG_6833

IMG_6745

——Wire Connection Modes——

 

Fix the electric meter to the meter box, and connect the interface according to the wiring diagram. It is recommended to use copper wire or copper terminal.

管理机英文资料2503

 


  • Previous:
  • Next:

  • Write your message here and send it to us